Transport and logistics · Government / state budget
Design Documentation for Reconstruction of Problem Intersections and Streets in Astana and Designer Supervision
Illustrative image
Project description
An analysis of passenger flows in Astana concluded that 20 intersections and 30 streets needed redesign of varying complexity. Detailed design documents were prepared for these locations: eight of the intersections required redesign of trolleybus lines and five the addition of turning lanes. Designer supervision followed.